EFC
EFC Revamp:
Site: Ain Sokhna.
Scope: To build an air-conditioning system for substation building in the EFC Revamp plant consisting of DX unit, fresh air fan, exhaust fans, MCCs & Control Main Contractor: Orascom.
Date: 2011 – 2012
EFC Revamp:
Site: Ain Sokhna.
Scope: To build an air-conditioning system for substation building in the EFC Revamp plant consisting of DX unit, fresh air fan, exhaust fans, MCCs & Control Main Contractor: Orascom.
Date: 2011 – 2012