EFC- Revamp Project
Project Date: 2011
Reflecting on the Success of Our Pioneering Collaboration. We are thrilled to share a glimpse into one of the remarkable projects that emerged from the collaborative synergy between ThyssenKrupp Uhde and AMTC
AMTC has been rewarded the contract for the detail engineering work for the HVAC systems of the new Electrical Substation, back in 2011, for EFC Revamp Project in Ain Al-Sokhna, Egypt. AMTC was responsible for several items could be summarized as:
– Verification of basic engineering for HVAC systems
– Co-ordination with civil engineering to establish a complete system as part of the building.
– Providing of load calculation HVAC.
– Detail engineering of HVAC systems.
– Providing of Bill of quantities.
– Issuing of the mechanical and electrical work shop drawings.
Mr. Halas Aykut, Uhde Project Manager, commented to AMTC: “You and your team proved to be well experienced, trustworthy, knowledgeable, co-operative and capable to emit the assigned responsibilities.”
Dr. Frank Seidemann, Senior Engineer HVAC, stated: “The work progress by your engineering team followed our time schedule without any delays or problems. Our joint meetings are impressed by a fruitful and successful co-operation atmosphere on a high technical level standard.”
AMTC
Engineering with Art