Dream factory
Dream Factory:
Site: Borg El-Arab – Alexandria.
Scope: To build an air-conditioning system for the whole Factory two chillers 160 TOR c/w pumps, four air handling units, with ducts, pipes, MCCs and control Main Contractor: Gama.
Date: 2011 – 2012